Beautiful MA kitchen remodel
FREE ESTIMATES: LANCASTER KITCHEN REMODELING

Kitchen remodeling in Lancaster, MA.
Fixed price. Fixed finish date.

Trusted by Lancaster homeowners since 2003. From cabinet selection to final walkthrough, we handle everything with our own crews, not subs.

Or call (774) 351-9747
Fixed Finish Date — In WritingFixed Price — No Surprise BillsIn-House Crews — No Subs500+ MA Kitchens Since 2003
Local Kitchen Experts — Lancaster, MA

Kitchen remodeling in Lancaster, MA — cabinets, countertops & full gut-renovations.

Lancaster homeowners want kitchen renovations that last as long as their homes.

Lancaster is a classic central Massachusetts town with an 18th-century center and a housing stock that spans antique colonials to mid-century homes to newer construction along its rural roads. Homeowners here tend to invest carefully and expect their renovations to last. We work with Lancaster homeowners who want a kitchen renovation built to endure: quality cabinet construction, durable countertops, properly permitted electrical and plumbing, and a crew that actually finishes what they start. Fixed price, written finish date.

What we handle in Lancaster

  • Full kitchen gut renovation & layout redesign
  • Semi-custom & custom cabinet installation
  • Quartz, granite & butcher-block countertops
  • Backsplash tile & under-cabinet lighting
  • Plumbing & electrical — fully permitted in Lancaster
  • Appliance installation & finish carpentry
  • Flooring — hardwood, tile, and LVP
500+
MA Kitchens
4–6 wk
Typical Timeline
2003
Serving MA

Lancaster Kitchen Remodeling — Common Questions

How much does kitchen remodeling cost in Lancaster, MA?

Kitchen renovations in Lancaster typically run $22,000–$55,000 for a full cabinet, countertop, and flooring replacement. We provide a fixed-price quote after measuring your kitchen — the number we give you is the number you pay.

Do you handle kitchen permits in Lancaster?

Yes. We pull all permits from the Lancaster Building Department and schedule all required inspections. Every kitchen we renovate is fully permitted and code-compliant.

"We wanted a kitchen that would last another 30 years. Mr. Gomes delivered — solid plywood-box cabinetry, quartz countertops, properly permitted electrical. Done in 5 weeks, fixed price. We're confident this kitchen outlasts us."

— Paul & Ann T., Lancaster MA

Your kitchen is costing you more than you think.

An outdated kitchen doesn't just look bad. It drags down your home's value, makes daily life harder, and signals to buyers that the whole house hasn't been cared for. If you recognize these problems, it's time.

Outdated Layout & Poor Lighting

→ A dark, cramped kitchen kills your enjoyment of the space and costs you 5–10% of your home's resale value.

Broken Cabinets & Worn Countertops

→ Damaged surfaces grow bacteria, trap moisture, and tell every guest the house isn't maintained.

Leaking Sink or Rotted Subfloor

→ A $400 sink fix ignored for 18 months can turn into a $15,000 subfloor and mold remediation nightmare.

After kitchen remodel
Before kitchen remodel
Before
After
← Drag to compare →

Real Mr. Gomes kitchen remodel

Dioclecio Gomes

Your kitchen deserves a craftsman,
not a contractor.

The family that's transformed MA homes since 2003.

I'm Dioclecio Gomes. I came to Massachusetts from Brazil and started remodeling in 2003. From the start, my rule was simple: treat every kitchen like my own family is cooking in it.

Big-box design centers sell you a package and hand you off to whoever is available. We don't work that way. We're a family business. Our design team, our carpenters, our tile setters: we know them by name and stand behind every cut.

When you call, you speak to us. When the kitchen goes in, our dedicated crew is there. We don't leave until you love it.

2003
Year Founded
500+
Kitchens Remodeled

The MA Kitchen Remodeling Reality

You're not choosing between us and Home Depot. You're choosing between us and the other licensed contractor with 50 Google reviews who still might disappear mid-project.

The Average MA Contractor

  • Rotating subs — different people in your home each week, no continuity
  • Vague "4–12 week" timeline that slips quietly with no explanation
  • Hidden allowances — the $50k quote becomes $65k once you're committed
  • Hard to reach after final payment when the punch-list items show up

Mr. Gomes Construction

  • Same in-house crew every day — carpenters, tile setters, and finishers we know by name
  • Written finish date before we break ground. If we miss it, we make it right.
  • Fixed-price contract. The number we quote is the number you pay.
  • Here since 2003. We'll be here in 2043 if anything needs attention.

A new kitchen doesn't have to be a nightmare.

Three clear steps. No high-pressure design centers. No surprises.

1

Free Consultation & Design

We visit your home, measure the space, discuss your vision, and walk you through cabinet styles, countertop materials, and layout options. No pressure, just good advice.

2

Material Selection & Fixed Quote

You choose your cabinets, countertops, backsplash, and fixtures from our curated catalog. We give you a fixed-price contract. What we quote is what you pay.

3

Installation, Finish & Written Deadline

Before we break ground, you get a written finish date. Our in-house crew handles every trade — no mid-project sub handoffs. Mr. Gomes walks through personally and doesn't call it done until you're fully satisfied.

Mr Gomes Crew Kitchen Remodeling
What to expect

Your kitchen. Week by week.

Before we break ground, you get a written schedule. Here's what a typical mid-level kitchen remodel looks like — no mystery, no guessing.

Timeline
Week 1
Demolition & Rough Prep
Old cabinets, countertops, and flooring are removed. Adjacent rooms are protected. Subfloor is inspected and repaired before anything goes back in.
Timeline
Weeks 2–3
Rough Trades — Electrical & Plumbing
Licensed electrician and plumber reroute for the new layout. All work is permitted and inspected before walls close. Cabinet delivery confirmed and tracked.
Timeline
Weeks 3–4
Cabinet Installation
Semi-custom or custom cabinets go in. Our carpenters level, shim, and scribe every run. No flat-pack shortcuts — every cabinet is set to last decades.
Timeline
Weeks 4–5
Countertops, Tile & Backsplash
Stone or quartz is templated and installed. Tile work and backsplash are set by our own tile setters — the same crew you met on Day 1, not a sub called in at the end.
Timeline
Week 5–6
Appliances, Fixtures & Final Walkthrough
Appliances connected, plumbing fixtures installed, punch list completed. Mr. Gomes walks through personally before calling it done. You sign off. Then we're done.

Timeline varies by scope · Exact schedule confirmed in writing before work begins

Lancaster homeowners trust us with their most-used room.

"They gave us a written finish date before starting and hit it exactly — done in 5 weeks. Not a day late. Same crew in our home every morning. Price didn't change by a dollar. We're in love with our new kitchen."

Linda M.

Framingham, MA

"Mr. Gomes remodeled our kitchen in 6 weeks before we listed the house. Our realtor said it added at least $40,000 to the sale price. The craftsmanship is impeccable — and the timeline guarantee was what sold us."

James & Carol T.

Shrewsbury, MA

"I had two other quotes — both vague on timeline and price. Mr. Gomes gave me a fixed price and a written finish date. It came in on time and on budget. That's all I wanted and they delivered it."

Patricia N.

Worcester, MA

We serve Lancaster

Mr. Gomes kitchen crews are active in Lancaster every week. Free in-home consultation with no obligation.

Auburn
Berlin
Blackstone
Bolton
Boylston
Charlton
Clinton
Douglas
Dudley
Grafton
Harvard
Holden

Your dream kitchen is closer than you think.

Financing Available

Flexible payment plans available for qualified buyers. Invest in your home now, pay over time.

ROI Up to 80%

A well-executed kitchen remodel returns 60–80% of cost at resale, the highest ROI of any home renovation.

Permits Handled

We pull all required MA building permits so your remodel is code-compliant and your home sale stays on track.

Ready to start your kitchen?

Get a free estimate in minutes — no pressure, no obligation.

Or call us: (774) 351-9747

Common questions.

Start your kitchen.
Stop waiting.